Local service guide

TV Mounting in Salt Lake City: Plan Before Booking

Masters' Guild · Updated

Arrange TV Mounting in Salt Lake City by asking the installer to confirm the wall attachment, bracket compatibility and cable route before you accept a quote. Separate mounting labor from any new or relocated electrical outlet. The city requires permits for electrical installation or alteration, so confirm that scope with Building Services before booking concealed electrical work. [1]

Define the job before comparing quotes

Send each installer the TV model number, a photo of the proposed wall and a photo showing the nearest outlet. Include the bracket model if you already own one. Ask the installer to check the TV and bracket instructions, identify the wall construction and explain the proposed attachment before drilling.

Request separate quote items for mounting labor, bracket supply, cable treatment, electrical work, wall repair and removal of the previous TV. Ask who supplies fasteners and who handles packaging. For a fireplace location, request a placement assessment using the TV and fireplace manufacturers' instructions before approving that position.

Compare written quotes for the same scope. Ask the installer to obtain your approval before charging for changes discovered on site.

Resolve the power route before installation

Tell the installer whether you want visible cable management or wiring behind the wall. Ask them to distinguish signal-cable routing from changes to the home's electrical system. Salt Lake City's permit guidance requires prescribed permits for electrical installation, alteration or improvement. Contact Building Services with the proposed outlet work before agreeing on the installation schedule. [1]

Salt Lake City's general permit page does not identify a TV-bracket exemption. If your installer proposes opening or altering the wall, describe the scope to the city and ask which approvals apply. For general building-code questions, the city lists 801-535-7155; for permit processing, it lists 801-535-7968. [1]

Ask who will perform any electrical work, who will handle the permit and who will arrange inspection. Keep those responsibilities in the quote. Agree on the sequence before booking wall repair or painting, and ask what happens to the mounting appointment if electrical work remains incomplete.

Choose the position and discuss restraint

Sit in your normal viewing position and mark the proposed screen outline with removable tape. Check the view from other seats, access to the TV's connections and the space needed to move an adjustable bracket. Ask the installer to confirm the attachment method for your actual wall before selecting fasteners.

Salt Lake County Emergency Management identifies nearby active fault lines and recommends securing TVs and other electronics with restraints, including brackets. Apply that regional guidance by asking how the installer will attach the bracket and engage the TV's retaining hardware. The county guidance does not certify a particular mount or promise that a mounted television will withstand an earthquake. [3]

Before the installer leaves, ask them to demonstrate any retaining mechanism, explain how to remove the TV for service and show the permitted movement of an adjustable mount. Keep the bracket instructions and take a photo of the attachment area before the television obscures it.

Schedule concealed work around inspection

Salt Lake City's permitting process directs applicants to request inspections before covering permitted work. Applicants can request an inspection before 3 pm for the next business day through the Citizen Access Portal or by calling 801-535-6000, option 2. Confirm the inspection arrangements before booking wall closure. [2]

For projects entering residential plan review, the city strives to return first-review comments within 14 business days for one- or two-family dwelling or townhome plan-review projects and within 21 business days for apartment projects. The clock starts when the city accepts the submission into the appropriate review queue. [2]

The chart compares those published administrative targets. Consult it if the mounting job forms part of a broader remodel requiring residential plan review. These targets do not establish a waiting time for a bracket installation or a standalone outlet permit. Ask Building Services which process applies before committing to an installation date. [2]

Arrange old-TV removal before the appointment

Salt Lake City's Call 2 Haul program accepts TVs as electronic waste. Residents signed up for the city's residential curbside garbage service receive two scheduled bulk pickups per year. Check your eligibility and remaining pickups before adding disposal to an installer's quote. [4]

Call 2 Haul requires a scheduled collection rather than an unscheduled curbside pile. The city asks residents to keep fragile items such as TVs visible and place them in containers if possible to reduce breakage. Contact the program at 801-535-6953 to arrange collection and confirm handling for your television. [4]

City first-review targets for broader residential projects

City first-review targets for broader residential projects. Data table follows.
Incorporated Salt Lake City, Utah · Published guidance retrieved October 11, 2026; no effective date stated. Salt Lake City Building Services publishes these two administrative targets; they do not come from a sample of completed permits. The city strives to return first-review comments within the stated number of business days after accepting a submission into the appropriate plan-review queue. The 14-business-day target applies to one- or two-family dwelling or townhome plan-review projects; the 21-business-day target applies to apartment projects. The accompanying table preserves the full eligibility wording. The targets exclude time before queue acceptance and do not measure final approval, inspection timing or TV installation duration. Consult them when mounting forms part of a broader project requiring residential plan review, and confirm the applicable process with the city. [2]
City first-review targets for broader residential projects (business days)
ItemValueSource
1–2-family / townhome14 [2]
Apartment projects21 [2]

Local details that affect your job

Check the address before choosing a permit office

Salt Lake City tells homeowners to check a Salt Lake County jurisdiction-boundary map if they are unsure whether an address lies within incorporated city limits. Its page identifies Magna, Kearns, Emigration Canyon and other unincorporated county districts as areas served through the Greater Salt Lake Municipal Services District. Verify your address before asking an installer to submit electrical permits. [1]

Leave access for the city's inspection

The city directs applicants to request inspections before covering permitted work. Ask your installer and electrical worker to agree on who schedules the inspection and when wall repairs can begin. Applicants can request a next-business-day inspection before 3 pm; confirm the appointment before coordinating the next task. [2]

Use the city's TV recycling option

Call 2 Haul accepts televisions and includes two scheduled bulk pickups per year for customers of the city's residential curbside garbage service. Confirm eligibility and arrange collection before deciding whether to purchase installer haul-away. [4]

Booking decisions and residential plan-review targets

Your situationNext step or published targetClarify before scheduling
Mounting with an existing outletRequest a defined mounting scopeBracket, wall attachment, cable treatment and cleanup
New or relocated outletConfirm electrical permitting with Building ServicesWho performs the work and handles the permit
Concealed permitted workRequest inspection before covering the workWho schedules inspection and repairs the wall
Replacing an old televisionCheck Call 2 Haul eligibilityAvailable pickup allowance and collection arrangements
One- or two-family dwelling or townhome plan-review projectsFirst-review-comment target: within 14 business days after acceptance into the appropriate review queueWhether the broader project requires this review; the target does not measure final approval or TV installation time
Apartment plan-review projectsFirst-review-comment target: within 21 business days after acceptance into the appropriate review queueWhether the broader project requires this review; the target does not measure final approval or TV installation time
[1] [2] [4]

Your hiring checklist

  1. Send the TV model, bracket model and photos of the wall and outlet.
  2. Mark the proposed screen position and assess it from your usual seats.
  3. Ask the installer to explain the wall attachment and retaining hardware.
  4. Separate electrical work, cable routing and wall repair in the quote.
  5. Confirm the permitting jurisdiction and approval requirements for the proposed scope.
  6. Assign responsibility for inspection before anyone closes permitted work.
  7. Agree on written approval for additional charges.
  8. Choose installer haul-away or confirm municipal collection eligibility.

Frequently Asked Questions

Does mounting a TV require a Salt Lake City permit?

Salt Lake City's general permit page does not state a TV-bracket exemption. It does require permits for electrical installation or alteration. Describe the proposed work to Building Services, including any outlet changes or wall alterations, and ask which requirements apply. [1]

Can the installer close the wall after concealed electrical work?

Salt Lake City's process directs applicants to request inspections before covering permitted work. Agree on inspection responsibility and timing before arranging patching or painting. [2]

What should I ask about securing the television?

Ask the installer to explain the wall attachment, bracket compatibility and TV retaining hardware. Salt Lake County's earthquake guidance recommends securing TVs and electronics, but it does not approve a specific mount or guarantee earthquake performance. [3]

Can the city collect my old TV?

Call 2 Haul lists TVs as accepted electronic waste. Customers of Salt Lake City's residential curbside garbage service receive two scheduled bulk pickups per year. Confirm your eligibility and arrange collection before setting the television out. [4]

Sources and scope

This guide combines the sources below with practical planning guidance. Figures apply to the stated geography and period; request a written quote for your property.

  1. Building Permit ApplicationsSalt Lake City Building Services · Salt Lake City, Utah, with county jurisdiction guidance · Checked 2026-10-11
  2. General Permitting Process InformationSalt Lake City Building Services · Salt Lake City, Utah · Checked 2026-10-11
  3. Hazard Preparedness ResourcesSalt Lake County Emergency Management · Salt Lake County, Utah · Checked 2026-10-11
  4. Bulk Item CollectionSalt Lake City Sustainability · Salt Lake City residential curbside garbage service customers · Checked 2026-10-11
Scroll to Top