Local service guide

Plumbing Services in Salt Lake City: Hiring Guide

Masters' Guild · Updated

Choose Plumbing Services in Salt Lake City by matching the plumber to your repair, checking their Utah license record, and agreeing on a written scope before work starts. For pipe alterations, utility repairs or irrigation backflow work, ask who will confirm the application route, arrange inspections and submit any required test report. Utah provides a license lookup, while city departments publish separate building, utility and backflow procedures. [1] [2] [3] [4]

Describe the problem before requesting a quote

Tell the plumber which fixture or pipe needs attention, when you first noticed the problem, and whether you have stopped using it. Photograph the affected area and the access route. For a replacement, include the existing fixture or heater's model information and say whether you plan to supply the new equipment.

Ask the plumber to separate diagnosis from repair authorization. Request the visit charge, the proposed investigation, and the point at which they will ask you to approve more work. For concealed piping, ask how they will locate the problem and what opening walls or floors would involve. Agree on who handles patching, painting and debris removal.

Check the people and business you plan to hire

Utah's Division of Professional Licensing lets you search by name and profession or by license number. Its lookup includes contractor records and plumber categories such as apprentice, journeyman, master, residential journeyman and residential master. Ask the business who will perform your work, then check the relevant records. [4]

Match the record to the name on your quote and review the status shown. Ask for an explanation of any mismatch or probation notation before accepting the proposal. Request proof of insurance and ask who will supervise the work, answer your questions and handle a return visit if the repair needs attention. [4]

Assign permit and inspection responsibilities

Salt Lake City Building Services directs applicants to submit its permit applications through the Citizen Access Portal. Building Services notes that additional plumbing permits may be necessary after building approval, and tells applicants to request inspections before covering work. Ask the plumber to confirm requirements for your exact scope and identify who will apply, pay fees and schedule inspections. [1]

For a remodel involving concealed pipes, agree on the inspection sequence before scheduling wall or floor repairs. Building Services accepts inspection requests before 3 pm for the next business day through the Citizen Access Portal or by phone. Confirm your inspection arrangements before booking the next trade; the published procedure describes when to request an inspection. [1]

If your project needs plan review, separate review time from the plumber's installation schedule. The city measures its first-review targets from acceptance into the appropriate queue. Staff must accept the project through pre-screening, and the applicant must pay the applicable plan-review fee before queue entry. Ask your contractor whether those steps are complete. [1]

Route water and sewer repair applications

Public Utilities lists repair permits among the applications it accepts through its Public Access Portal. For projects requiring an associated Salt Lake City building permit, it directs applicants through Building Services and says not to submit those projects to the Public Access Portal. Before authorizing water-service or sewer work, ask which route applies to your project. [3]

Have the contractor put the proposed repair limits in writing: where work begins and ends, what they will excavate, and who restores disturbed surfaces. Ask them to confirm the application route with Public Utilities if the scope remains unclear. The department lists 801-483-6727 for Development Services. [3]

Include backflow testing in irrigation work

Salt Lake City Public Utilities identifies lawn sprinklers, irrigation systems, hoses and hose bibs among residential cross connections. The utility defines a cross connection as an actual or potential connection between drinking water and a non-potable fixture, equipment or system. For irrigation changes, ask the provider to identify the existing protection and explain what the proposed work requires. [2]

The utility requires annual testing of testable backflow assemblies and submission of results to the water supplier. Its page also states a testing requirement 10 days after installation. It identifies atmospheric vacuum breakers as exempt from annual testing, so ask which device you have before booking a recurring service. [2]

Include the test, report submission and a copy of the result in your agreement when applicable. If you received a utility letter with an access code, the city directs you to submit through its online portal. Ask the provider who will complete that submission and how they will document it for you. [2]

Salt Lake City first plan-review targets for housing projects

Salt Lake City first plan-review targets for housing projects. Data table follows.
Salt Lake City Building Services · Published guidance retrieved October 11, 2026. These two published targets cover first review comments for housing projects requiring plan review: one- or two-family dwellings and townhomes, and apartment projects. The city counts business days from acceptance into the appropriate review queue. This is administrative guidance, not a sample of completed projects or measured turnaround times. Use it to discuss scheduling for a plumbing remodel requiring plan review. It does not establish a completion deadline, permit-issuance time or duration for routine plumbing repairs. [1]
Salt Lake City first plan-review targets for housing projects (business days)
ItemValueSource
Houses/townhomes14 [1]
Apartments21 [1]

Local details that affect your job

Building and utility applications use different routes

Building Services permit applications use the Citizen Access Portal. Public Utilities accepts standalone repair permit applications through its Public Access Portal, but sends projects requiring an associated city building permit through Building Services. Ask your plumber to identify the correct route before applying so you can track the application with the right department. [1] [3]

Inspect concealed work before closing it

Building Services instructs applicants to request inspections before covering work. It accepts requests before 3 pm for the next business day. For a bathroom remodel or concealed-pipe project, assign inspection scheduling to a named person before arranging drywall or flooring work. [1]

Backflow service includes reporting

The local utility requires annual testing of testable backflow assemblies and submission of results to the water supplier. Ask for reporting as part of the service, and identify the device first because the city's guidance excludes atmospheric vacuum breakers from annual testing. [2]

Questions to settle before authorizing work

Your projectAsk the providerLocal procedure to confirm
Fixture or accessible-pipe repairWhat does diagnosis cost, and what repair will I authorize?Confirm permit requirements for the exact scope with Building Services.
Remodel with concealed plumbingWho obtains permits and schedules inspections before walls close?Building Services notes possible additional plumbing permits and inspections before covering work.
Water-service or sewer repairWhich department and portal will handle the application?Public Utilities accepts repair applications through its Public Access Portal; projects requiring associated city building permits go through Building Services.
Irrigation backflow installation or testingWhich device do I have, and will you submit the test report?Testable assemblies require annual testing and reporting; atmospheric vacuum breakers do not require annual testing.
[1] [2] [3]

Your hiring checklist

  1. Photograph the problem, equipment label and access area before requesting offers.
  2. Ask for the business name, plumber's license number and insurance documentation.
  3. Check the relevant Utah license records and resolve any name or status questions.
  4. Get written diagnostic charges, repair scope, exclusions and approval terms for extra work.
  5. Ask who will confirm permit requirements, submit applications and arrange inspections.
  6. For utility work, confirm the application route and surface-restoration responsibilities.
  7. For applicable backflow work, include testing, report submission and a copy for your records.
  8. Keep the accepted quote, change approvals, inspection records and final invoice together.

Frequently Asked Questions

How do I check a plumber's Utah license?

Ask for the plumber's name and license number, then use the Division of Professional Licensing lookup. You can search by name and profession or license number. Check the contractor business record where relevant and ask who will perform and supervise your work. [4]

Does my plumbing project need a permit?

Confirm the exact scope with Building Services before work begins. The city's process page says additional plumbing permits may be necessary after building approval, but it does not provide a complete list of plumbing repair exemptions. Ask the contractor to document the determination and responsibilities. [1]

Do I apply to Public Utilities for a sewer repair?

Public Utilities accepts repair permit applications through its Public Access Portal. If your project requires an associated Salt Lake City building permit, the department directs submission through Building Services via the Citizen Access Portal. Ask the contractor which route applies before submitting an application. [3]

Does every irrigation backflow device need annual testing?

The city's guidance requires annual testing and reporting for testable backflow assemblies and identifies atmospheric vacuum breakers as exempt from annual testing. Have the provider identify your device and confirm the testing and reporting arrangements for it. [2]

Sources and scope

This guide combines the sources below with practical planning guidance. Figures apply to the stated geography and period; request a written quote for your property.

  1. General Permitting Process InformationSalt Lake City Building Services · Salt Lake City, Utah · Checked 2026-10-11
  2. Cross Connection Control and Backflow PreventionSalt Lake City Public Utilities · Salt Lake City Public Utilities water system · Checked 2026-10-11
  3. Development ServicesSalt Lake City Public Utilities · Salt Lake City Public Utilities service jurisdiction · Checked 2026-10-11
  4. Licensee Lookup and Verification SystemUtah Division of Professional Licensing · Utah · Checked 2026-10-11
Scroll to Top