Local service guide

Door and Window Repair in Philadelphia, PA

Masters' Guild · Updated

Arrange Door and Window Repair by getting a component-level assessment, an itemized quote and written responsibility for any approvals before booking. Philadelphia exempts unchanged-size exterior replacement at nonhistoric one-or-two-family dwellings from the permit requirement. For a registered historic property, check exterior-work review requirements before ordering; interior alterations need Historical Commission review only when the interior is designated. Give the contractor your building type and a clear description of the proposed work. [1] [2]

Describe the problem before choosing replacement

Photograph the whole opening from inside and outside, then capture the damaged area, hardware and manufacturer label. Describe the symptom without assigning a cause: a sash that will not stay up, a latch that misses its strike, cloudy glass, a draft or water appearing during rain.

Have the contractor separate glass, operating hardware, weatherstripping, frame condition and surrounding wall work in the assessment. For a sticking door, request an inspection of the hinges, latch alignment and frame before approving a replacement. Ask which defect each proposed repair will address.

Tell the contractor if you cannot secure the opening. Request separate prices for temporary protection and permanent repair, and keep people away from loose glass. Describe access constraints, including the floor level and whether the crew can reach the opening from outside.

Confirm permits and scheduling

Philadelphia exempts unchanged-size exterior door and window replacement at nonhistoric one-or-two-family dwellings from permitting. Other exterior replacements without size changes may qualify for an EZ permit if they meet the applicable standard. The City requires building permits for major repairs outside regular maintenance and structural changes. Confirm opening enlargement or structural frame work with L&I before approving it. [1] [3]

For online EZ applications, the City says it processes most applications without plans within 5 business days. Qualifying exterior door and window permits may issue immediately when a contractor applies with current licensing, insurance and tax accounts. For in-person EZ applications, L&I reviews applications while the applicant waits. These routes do not establish a fixed five-day wait for your job. [1]

For standard building-permit applications, the City lists 15 business days for alterations or additions to one-or-two-family dwellings and 20 business days for its all-others category. Online applicants should allow an additional business day for preprocessing. Ask the contractor to separate application review, any historic approval, material delivery and installation in the schedule. [3]

Resolve historic review before ordering

For properties on the Philadelphia Register of Historic Places, the Historical Commission requires review for listed exterior work, including window and door repair, removal and replacement. Its jurisdiction over interiors extends only to designated interiors. The Commission exempts standard maintenance such as replacing clear window glass. Describe any accompanying sash, frame or appearance changes when confirming your scope. [2]

Contact Historical Commission staff during planning at 215-686-7660. The City charges no fee for project review. Staff may request photographs, drawings and other documentation, and may refer an application to the Architectural Committee and Historical Commission. Have your contractor prepare product details and photographs before you commit to an order. [2]

Discuss paint disturbance during component repairs

EPA distinguishes glass replacement and window-balancer repair from full window replacement, but says these activities remain subject to the Renovation, Repair and Painting Rule unless they meet the minor-repair and maintenance definition. Removing painted glazing can disturb paint. The cited guidance sets a limit of six square feet of disturbed painted surface per room for that definition; when removing a component, EPA bases the calculation on the component's surface area. [4]

Have the contractor explain whether the rule applies and how they will assess painted components before removal. Request a written plan for containment, cleanup and disposal where applicable. Use the area discussion to ask informed questions rather than treating it as a complete account of the rule's applicability or exemptions. [4]

Compare quotes and agree on completion

Request separate line items for parts, labor, access equipment, disposal, trim restoration and exterior sealing. Specify the glass or hardware the contractor proposes. If you are considering replacement, obtain a separate proposal so you can compare the scope and finish work with the repair option.

For permitted work, Philadelphia requires a licensed City contractor, with exceptions for qualifying existing one-or-two-family home projects. Those exceptions include a registered Pennsylvania Home Improvement Contractor who holds a Philadelphia Commercial Activity License. Verify the credentials for your project's route and request current insurance information. [3]

Name the person responsible for applications, fees and inspections in the contract. The City issues approval documents after successful completion of required inspections. Agree on written authorization for hidden-damage charges before removal begins. At handover, test operation and locks, inspect the agreed finish work and collect warranties and any required approval documents. [3]

Philadelphia building-permit filing fees by occupancy

Philadelphia building-permit filing fees by occupancy. Data table follows.
City of Philadelphia · Published fee guidance retrieved October 11, 2026. The City lists these filing fees for its standard building-permit application, in US dollars. This is an administrative fee schedule, not a survey of repair jobs. The filing fee is nonrefundable and counts toward the final permit fee. These figures do not represent total permit costs, EZ permit fees or contractor prices. Confirm whether your work requires a permit before adding a fee to your budget. [3]
Philadelphia building-permit filing fees by occupancy (USD)
ItemValueSource
One/two-family dwellings25 [3]
Other occupancies100 [3]

Local details that affect your job

Building type changes the permit route

Philadelphia's unchanged-size exterior replacement exemption covers nonhistoric one-or-two-family dwellings. If your home is a unit in a larger building, confirm EZ eligibility with L&I instead of applying the house exemption. State the building type and whether the contractor will alter the opening before requesting an application decision. [1]

Historic review depends on location and scope

For a registered historic property, confirm review for exterior door and window repairs or replacements before ordering. Interior alterations require Commission review only when the interior is designated. Clear window glass replacement falls within the maintenance exception. Explain whether you will retain the sash and frame and whether you propose any other exterior changes. [2]

Assign inspection responsibility

For approved permitted work, Philadelphia lets you request inspections through eCLIPSE or by calling 215-255-4040 when the contractor is ready. Put that responsibility in the agreement and request the resulting approval documents at handover. [3]

Choose your next approval step

Proposed workLocal requirementNext step
Unchanged-size exterior replacement at a nonhistoric one-or-two-family dwellingThe City exempts this replacement from permitting.Confirm that the quote includes no opening change.
Unchanged-size exterior replacement at another building typeThe work may qualify for an EZ permit under the applicable standard.Confirm eligibility with L&I and identify the applicant.
Exterior door or window repair or replacement on a registered historic propertyThe Commission requires review for listed exterior work, subject to maintenance exceptions.Confirm the scope with Commission staff before ordering.
Interior alteration on a registered historic propertyCommission review applies only when the interior is designated.Confirm interior designation and any separate permit requirements.
Clear window glass replacement on a registered historic propertyThe Commission exempts this standard maintenance from project review.Confirm whether accompanying work changes that scope.
Major repair or structural opening changeThe City's building-permit guidance covers major repairs and structural changes.Confirm permit and plan requirements before work.
[1] [2] [3]

Your hiring checklist

  1. Photograph the opening, damage, hardware and manufacturer labels.
  2. Describe operating problems, water entry and security concerns.
  3. Confirm building type and historic designation before ordering.
  4. Request a repair option with retained and replaced parts identified.
  5. Assign approval, permit and inspection responsibilities in writing.
  6. Discuss painted-component removal and cleanup.
  7. Compare itemized quotes and authorize hidden-damage charges in writing.
  8. Test operation and locks and collect warranties and completion documents.

Frequently Asked Questions

Do I need a permit to replace a window?

Philadelphia exempts unchanged-size exterior window replacement at a nonhistoric one-or-two-family dwelling. Other building types may qualify for an EZ permit. Confirm opening changes and historic-property work with the relevant City staff before starting. [1] [2] [3]

Does historic designation affect an interior door repair?

The Historical Commission requires review of interior alterations only when the interior itself is designated. Its exterior review requirements cover listed door and window work on registered properties. Confirm the location and scope of your repair with staff. [2]

Can replacing glass disturb painted surfaces?

Yes. EPA explains that removing painted glazing can disturb paint and bring a component repair under the RRP Rule. When removing a component, EPA bases the painted-area calculation on its surface area. Have the contractor assess applicability before removal. [4]

How much should I budget?

Obtain an inspected, itemized quote covering parts, labor, access, disposal and finish restoration. Request separate repair and replacement options where useful. Have the contractor identify approval fees and explain how you will authorize additional work if removal reveals damage.

Sources and scope

This guide combines the sources below with practical planning guidance. Figures apply to the stated geography and period; request a written quote for your property.

  1. Get permits without plans (EZ permits)City of Philadelphia Department of Licenses and Inspections · Philadelphia, Pennsylvania · Checked 2026-10-11
  2. Get approval for work to a historic propertyCity of Philadelphia Historical Commission · Philadelphia, Pennsylvania · Checked 2026-10-11
  3. Get a Building PermitCity of Philadelphia Department of Licenses and Inspections · Philadelphia, Pennsylvania · Checked 2026-10-11
  4. How is window repair or maintenance, as distinct from removal, treated under the RRP Rule?U.S. Environmental Protection Agency · United States · Checked 2026-10-11
Scroll to Top