Bricklaying and Masonry in Montreal: Hiring Guide

Masters' Guild · Updated

For Bricklaying and Masonry in Montreal, ask contractors to quote a defined repair area, identify proposed materials and explain their access plan before you choose an offer. Check your borough’s permit rules for that scope: Outremont requires a permit even for repointing, while Verdun requires one as soon as a brick is removed. Scaffolding or a container on public space can require a separate occupation permit. Assign responsibility for both applications before agreeing to a start date. [1] [2]

Give each contractor the same repair brief

Take an overview photo of each affected wall and closer photos from a safe position. Mark the areas where you want an assessment, identify the floor level and describe any leaks you have observed. Include the location of entrances, balconies and the available space for equipment. Ask each bidder to visit and explain the work they recommend.

Request separate quantities for joint repairs, replacement bricks and any work around window or door openings. Ask the contractor to distinguish the agreed repair area from additional work they might recommend after opening the wall. Require written approval and a price before they expand the scope.

For repointing, ask how the contractor will remove existing mortar, choose the replacement mortar and finish the joints. For brick replacement, request the proposed brick’s dimensions, colour and texture. Ask for a sample area before approving the appearance of a visible façade.

Confirm the borough rules before ordering materials

Select your borough on the city’s exterior-cladding guidance and describe the work precisely to the permit counter. The city distinguishes maintenance from replacement and warns that heritage or architectural protections can add requirements, including a plan d’implantation et d’intégration architecturale, or PIIA. Ask whether those protections apply to your address. [1]

Do not use another borough’s repair allowance to plan your project. Outremont requires a permit for minor repairs such as repointing and for replacement with identical material. Verdun allows joint maintenance without a permit but requires a permit when you remove any brick. [1]

In Le Plateau-Mont-Royal, the city requires permits for major repairs, cladding replacement, lintel replacement and sill replacement. It also requires original cladding materials for existing buildings. Confirm the proposed material and scope with the permit counter before asking your contractor to order supplies. [1]

Include scaffold access in the schedule and budget

Ask the contractor to show where scaffolding, a debris container and material storage will go. Montreal requires an occupation permit for a container on public space or scaffolding that encroaches on the sidewalk. The public-space permit is a separate planning item from permission to repair the building. [2]

In Plateau-Mont-Royal, the city requires applications at least 10 working days before the start of work. It also requires arrangements that preserve pedestrian and cyclist passage when maintenance encroaches on those routes, including access for people with reduced mobility. The applicant must obtain and install the temporary signage. [2]

Have the quote identify who applies, who pays the city invoice and who arranges signage. Ask for the planned occupation dates and the cost of extending them. The city bases occupation charges on location, occupied area, duration and parking meters, so ask the contractor to explain the proposed setup rather than offering an unexplained access allowance. [2]

Check qualifications and compare complete quotes

Ask for the contractor’s business name and RBQ licence number, then use the licence-checking resources identified on the RBQ website. Ask the contractor to explain the licence coverage for your scope. The RBQ examination table lists subclass 4.1 as Contractor – masonry structures; that label alone does not establish a particular bidder’s authorization for your entire project. [3]

Request proof of liability insurance and examples of comparable repairs. Ask who will supervise the work and whether another business will carry out any part of it. For a wall assessment or repair around openings, ask whether the proposed scope needs an engineer’s involvement and who would arrange it.

Compare quotes that cover the same quantities and include material specifications, scaffolding, permits, debris removal, taxes and cleanup. Request a payment schedule, written warranty terms and a process for approving changes. These sources do not establish local contractor repair prices, so use site-specific written offers to set your budget.

Ask for an autumn weather plan

At Montreal Trudeau Airport, the 1991–2020 climate normals report 4.9 October days and 18.6 November days per month with minimum temperatures at or below 0°C. These historical averages describe airport conditions, not the forecast or temperature at your wall. Use them as a reason to discuss weather protection and scheduling before accepting an autumn start. [4]

Ask the contractor to identify the chosen mortar’s application and curing requirements and explain how they will monitor conditions. Have them describe rain protection, any planned enclosure or heating, and the circumstances that would make them postpone work. Agree on responsibility for added protection costs and changes to occupation dates.

Historical autumn days with freezing minimum temperatures

Historical autumn days with freezing minimum temperatures. Data table follows.
Montreal Trudeau Airport, Quebec · 1991–2020 Canadian climate normals. Published monthly average counts of days with minimum temperature at or below 0°C for the airport composite station. The source reports 25 years of data for this temperature-count element within the normal period. September, October and November show the autumn scheduling context. These observations do not predict this year’s weather, establish wall temperatures or specify safe mortar application conditions. [4]
Historical autumn days with freezing minimum temperatures (days/month)
ItemValueSource
September0.13 [4]
October4.9 [4]
November18.6 [4]

Local details that affect your job

Outremont repointing needs a permit

Outremont requires a permit for minor exterior-cladding repairs, including repointing, and for replacement with identical material. If you plan to change the cladding, the city also identifies PIIA review and additional fees, documents and delays. Contact the permit counter before booking the crew, even for a joint-repair project. [1]

Verdun distinguishes joint repairs from brick removal

Verdun permits joint maintenance without a permit, but requires one as soon as you remove a brick. Ask the bidder whether their repointing proposal includes brick removal. Include that answer in your permit inquiry rather than describing the entire job as maintenance. [1]

Plateau access requires advance coordination

For public-space occupation in Plateau-Mont-Royal, submit the application at least 10 working days before work begins. The city requires this permit in addition to the permits for the work itself. Assign the application and signage responsibilities in the contract before confirming scaffold delivery. [2]

Match your project to the next planning step

Project situationLocal requirement or considerationNext step
Repointing in OutremontThe borough requires a permit for minor repairs, including repointing.Check application requirements before booking the repair.
Brick removal in VerdunA permit is required as soon as a brick is removed.Ask whether the quote includes removal and describe it to the permit counter.
Lintel or sill replacement in Le Plateau-Mont-RoyalThe borough lists both replacements as work requiring a permit.Confirm permit documents and proposed materials before ordering.
Scaffolding on public space in Plateau-Mont-RoyalA separate occupation application must arrive at least 10 working days before work.Assign the application, signage and fees before setting delivery dates.
[1] [2]

Your hiring checklist

  1. Photograph each affected wall from a safe position and mark the requested assessment areas.
  2. Ask bidders to separate joint repairs, brick replacement and work around openings.
  3. Confirm permit and heritage requirements for your address and exact scope.
  4. Request proposed brick and mortar specifications plus a sample-area agreement.
  5. Ask for the business name, RBQ licence number and proof of liability insurance.
  6. Assign scaffold permits, signage, city fees and extension costs in writing.
  7. Compare quantities, exclusions, taxes, cleanup and payment terms across offers.
  8. Agree on weather protection and written approval for additional work.

Frequently Asked Questions

Do I need a permit for repointing?

Check your borough and your building’s heritage status. Outremont requires a permit for repointing. Other borough sections allow joint maintenance without one, with exceptions in some protected buildings or areas. Describe the exact work to your permit counter before you start. [1]

Can the contractor use identical bricks without a permit?

Identical material does not create a citywide exemption. Outremont requires a permit for identical replacement, and Verdun requires one when any brick is removed. Ask the borough about your address, the quantity and the removal method. [1]

Does the renovation permit cover sidewalk scaffolding?

In Plateau-Mont-Royal, the city requires the occupation permit in addition to the permits needed for the work. Confirm who will apply, arrange temporary signage and pay occupation charges before the contractor installs equipment. [2]

How should I compare masonry quotes?

Give bidders the same scope and ask for quantities, material specifications, access arrangements, permit responsibilities and exclusions. Request an explanation of any proposed extra work. Compare the full written offer and change-approval process alongside the total.

Sources and scope

This guide combines the sources below with practical planning guidance. Figures apply to the stated geography and period; request a written quote for your property.

  1. Réparer ou remplacer un revêtement extérieurVille de Montréal · Montreal, Quebec; borough-specific requirements · Checked 2026-10-11
  2. Obtenir un permis d’occupation temporaire du domaine public pour travauxVille de Montréal · Montreal, Quebec; Plateau-Mont-Royal guidance used · Checked 2026-10-11
  3. Preparation for examinationsRégie du bâtiment du Québec · Quebec · Checked 2026-10-11
  4. Canadian Climate Normals 1991–2020: Montreal Trudeau (Airport)Environment and Climate Change Canada · Montreal Trudeau Airport, Quebec · Checked 2026-10-11
Scroll to Top