Local service guide
Interior Design in Manchester, NH: Plan and Hire
For Interior Design in Manchester, NH, choose a designer around the work you need: room layout and furnishings, purchasing support, or renovation coordination. Ask for a written scope, separate design and construction budgets, and named responsibility for measurements, orders and permits. Before approving changes to painted surfaces in an older home, discuss lead-safe preparation; before moving wiring or plumbing, check the city's permit process. [1] [3]
Choose the help your room needs
Write down the problem before collecting inspiration images. You might need seating that leaves a clear route through the living room, storage near the entrance, or a kitchen layout that accommodates two people cooking. Tell the designer what you want to keep, who uses the space and which decisions you want help making.
For a furnishings project, request a measured layout, product specifications and a shopping list with dimensions. If you want the designer to order goods, add purchasing and delivery responsibilities to the agreement. For renovation work, ask who prepares drawings, checks existing conditions and coordinates the contractor. Request examples of comparable work and explain the parts of those projects you want to discuss.
Compare fees and purchasing terms
Request written proposals for your room and scope. Compare design fees, purchasing terms, construction costs and permit allowances separately. Ask each candidate to identify furniture and materials, delivery and installation charges so you can compare the total planned spending.
For an hourly proposal, request an estimate of hours and a spending limit that requires your approval to exceed. For a fixed fee, list the included drawings, meetings and revision rounds. Ask about additional charges for site visits, substitutions and changes after approval.
Before authorizing purchases, ask how the designer handles trade discounts, markups, payment, returns and damaged deliveries. Agree on who approves substitutions and who tracks refunds. Have the designer confirm access measurements before you approve large furniture: include door openings, stair turns and the route from the delivery vehicle.
Check older surfaces before choosing finishes
Manchester's Health Department identifies older housing, lead paint, moisture and poor ventilation as local home-health concerns. It advises residents to report leaks and use safe renovation practices in older homes. Ask the designer to account for condition assessment and repairs before you approve wallpaper, cabinetry or other finishes over affected areas. [2]
EPA's Renovation, Repair and Painting rule generally requires certification for firms paid to disturb paint in pre-1978 housing, subject to listed exceptions. Covered activities include painting preparation, carpentry, electrical work and plumbing. Ask the firm performing that work to explain the applicable requirements and provide its certification information. [3]
EPA does not require paint testing under this rule. Unless qualifying documentation establishes that the affected paint is not lead-based, the rule's requirements apply to covered work. If you choose testing, arrange it through an appropriately qualified professional before setting the preparation scope and schedule. [3]
Assign renovation responsibilities before work starts
Give the city's Planning and Community Development Department a description of your proposed changes and ask which applications your project needs. Manchester provides building-permit applications online. Its posted electrical and plumbing instructions require printed, signed applications submitted by mail with fees, and direct applicants to wait for an approved permit before starting that work. [1]
Ask the designer and contractor to identify who submits applications, responds to city questions and schedules required inspections. Put these responsibilities in the agreement. Tie purchasing approvals to confirmed dimensions and construction decisions so you can resolve layout changes before ordering fitted items.
Make lighting selections specific
ENERGY STAR describes bulb brightness in lumens and distinguishes that output from electrical wattage. Its national replacement reference pairs a traditional 40-watt incandescent bulb with at least 450 lumens, a 60-watt bulb with 800 lumens and a 75-watt bulb with 1,100 lumens. [5]
Use those comparisons to tell the designer which existing lamps feel too dim or too bright. Ask for a lighting schedule that identifies bulb output, color appearance, fixture dimensions and dimmer compatibility. Review samples in the room before approving a whole-room purchase, and assign any proposed wiring changes to the permit discussion.
Replacement-bulb brightness reference

Local details that affect your job
Account for the city's renovation fee formula
Manchester lists the building-permit charge for alterations, renovations or repairs as 1% of estimated work cost, plus a $25 application fee. The city also assesses $0.02 per square foot for plan review on multifamily and commercial building-permit applications. If your home sits in a multifamily building, ask the city how that additional charge applies to your project. Keep these municipal building-permit charges separate from design fees, trade permits and other renovation expenses. [4]
Tell the designer your building and occupancy type
Manchester's electrical application instructions require a licensed NH Master electrician for multifamily dwellings, non-owner-occupied single-family dwellings and commercial projects. Its plumbing instructions require a licensed NH plumber for those same categories. If you own a unit in a multifamily building or are arranging work in a rental house, disclose that before the designer selects the trade team. Confirm the application route before scheduling installation. [1]
Match the agreement to your project
| Your project | Scope to request | Before committing |
|---|---|---|
| Layout and furnishings | Measured furniture plan and product list | Clarify who verifies dimensions and places orders. |
| Purchasing support | Ordering, delivery tracking and installation coordination | Agree on markups, returns and substitutions. |
| Kitchen or bathroom changes | Design drawings and contractor coordination | Ask the city which permits apply; name the applicant. |
| Paint disturbance in an older home | Preparation plan alongside finish selections | For pre-1978 housing, check EPA rule coverage and firm certification. |
| Renovation in a multifamily building | Design and qualified trade coordination | City instructions require a NH Master electrician and licensed NH plumber for the respective work. |
Your hiring checklist
- Describe the room's main problem, daily users and items you want to keep.
- Photograph the room and gather existing plans; assign responsibility for checking dimensions.
- Set separate spending limits for design, purchases and construction.
- Request written deliverables, revision limits and approval milestones.
- Agree on purchasing markups, substitutions, returns and delivery handling.
- Ask who assesses existing surfaces and handles any lead-safe preparation.
- Assign permit applications and trade coordination before approving renovation work.
- Approve final dimensions and specifications before authorizing orders.
Frequently Asked Questions
How much should I budget for a designer?
Request written proposals for your room and scope. Compare design fees, purchasing terms, construction costs and permit allowances separately. Give each candidate the same list of deliverables and ask how you will approve additional spending.
Does hiring a designer cover renovation permits?
Assign permit responsibility in writing and confirm the project requirements with the city. Manchester's electrical and plumbing instructions say applicants must receive an approved permit before starting the respective work. [1]
Do I need lead testing before redesigning an older room?
EPA does not require testing under its renovation rule. For covered work, requirements apply unless qualifying documentation establishes that affected paint is not lead-based. Ask the renovation firm to explain coverage and any applicable exception before preparation begins. [3]
What should I bring to the first design meeting?
Bring room photos, any existing plans, your spending limits and a list of furniture you want to keep. Explain the daily activities the room needs to accommodate and who will approve purchases.
Sources and scope
This guide combines the sources below with practical planning guidance. Figures apply to the stated geography and period; request a written quote for your property.
