Local service guide
Madison office relocation: hiring and setup
For office relocation in Madison, hire a mover against a written inventory and setup plan, assign responsibility for truck access, and confirm that you can occupy the destination before committing to the move date. Ask for the carrier’s Wisconsin LC authority certificate for transport within the state. Wisconsin DOT identifies federal FMCSA authority for interstate carriers hauling regulated commodities. Separate furniture transport, assembly, and IT reconnection in the quote so you know who will prepare the office for staff. [4]
Define what the mover will deliver
Send each bidder the same inventory: desks, chairs, shelving, file cabinets, printers, monitors, and equipment that needs special handling. Include photographs, dimensions of bulky pieces, both addresses, stairs, elevator access, and the proposed floor plan. Ask the mover to inspect access before you accept its quote.
Write down who packs files, disconnects equipment, dismantles furniture, supplies cartons, and rebuilds workstations. Ask whether the crew will place furniture by room label or assemble each desk to the agreed layout. Identify items you will carry yourself, such as confidential records or devices containing sensitive information.
Ask bidders to separate transport, packing, assembly, storage, and IT work. Request the charging basis and conditions for extra charges, including elevator waiting time, additional truck trips, or a changed inventory. Compare quotes against the same scope so you can judge what each total includes.
Check the carrier and building arrangements
Wisconsin DOT describes operating authority as permission to transport someone else’s property for compensation. For intrastate property carriage, the department issues a certificate with an authority number beginning with LC. Ask the company that will perform the transport for that certificate and match the business name to your agreement. [4]
For a route crossing state lines, ask which company will transport the goods and request its applicable federal authority details. Wisconsin DOT identifies FMCSA as the authority issuer for interstate carriers hauling regulated commodities or passengers. Request credentials from the transporting company, even if another business handles furniture assembly. [4]
Ask both building managers about freight-elevator bookings, loading areas, access hours, floor protection, and insurance documents they want before the crew arrives. Put the agreed loading window in the mover’s booking. Request written damage and claims terms, including how the mover handles owner-packed equipment and who receives a claim.
Arrange truck access before move day
For metered curb space, call Madison’s Parking Division at 608-266-4761 to request meter signs. The city reviews requested locations before approval. Published reservation fees are $10 per meter for a half day and $18 per meter for a full day, plus $2 per meter sign issued. The city lists no reservation charge on Sundays. [1]
The city’s half-day windows run from 8:00 am to 1:00 pm and from 1:00 pm to 6:00 pm. Use before and after 1:00 pm requires a full-day reservation. Ask the mover to align its loading plan with the approved window and account for time to finish loading. [1]
For non-metered streets, request temporary no-parking signs through the same division. The city charges $2 per sign and requires the purchaser to post them at least 48 hours before the requested period for enforcement. Assign posting and removal to a named person. Both city pages state that storage containers require a Street Occupancy Permit. [1] [2]
Confirm occupancy and test the finished office
Ask the landlord what zoning use the city last approved for the destination. Madison requires a Zoning Certificate of Occupancy for a new non-residential tenant or business occupying a previously occupied space with a different zoning use from the most recent approved use, when no changes require building-code review and no site changes are planned. The city notes that many new businesses do not need this process. [3]
If that process applies, submit the application to Zoning and arrange Building Inspection and Fire Inspection signoffs. The published application fee is $75. If the project requires building-code review and involves a tenant change, the city says the certificate is included in the building permit. Confirm the applicable route with Zoning before setting your opening date. [3]
Give your IT contact a separate reconnection plan. Back up business data, label devices and cables, and identify who will test internet access, phones, printers, and shared files. Before the crew leaves, walk through the inventory and furniture placement with its supervisor. Record missing items or damage, then test each workstation before staff resume work.
Madison metered-space reservation fees

Local details that affect your job
A loading window that crosses lunch needs a full day
Madison requires a full-day meter reservation if you use the space before and after 1:00 pm. Tell the mover whether packing and loading could cross that boundary, and assign someone to purchase, post, and remove the meter signs. The purchaser must post signs before occupancy for enforcement and remove them immediately after use. [1]
Non-metered streets need advance posting
Temporary no-parking signs on non-metered streets need city approval and posting at least 48 hours before the requested restriction for enforcement. Confirm who will visit the destination to post them. Schedule that visit before move day rather than assigning it to the arriving truck crew. [2]
Check the destination’s occupancy approval route
Madison ties its zoning change-of-use certificate to specific conditions, including a different previously approved zoning use and no changes requiring building-code review or site changes. Ask Zoning at 608-266-4511 Ext. 3 if you are unsure. Discuss the approved use and planned alterations before paying a move deposit. [3]
Choose the next step for your move
| Situation | Next step | Confirm before booking |
|---|---|---|
| Transport stays within Wisconsin | Request the carrier’s Wisconsin LC authority certificate. | The transporting business matches the agreement. |
| Transport crosses state lines | Request applicable federal carrier-authority details. | Who performs transport and which authority applies to the shipment. |
| Truck needs metered curb space | Request city meter signs. | Approved location, reservation window, sign posting, and removal. |
| Truck needs non-metered curb space | Request temporary no-parking signs. | Someone can post signs at least 48 hours before the restriction. |
| Destination has a different approved zoning use | Ask Zoning which occupancy process applies. | Whether alterations or site changes change the approval route. |
Your hiring checklist
- Send bidders one inventory, access description, and destination floor plan.
- Request the transporting company’s authority details, insurance documents, and written damage terms.
- Confirm elevator, loading-area, and access arrangements with both building managers.
- Assign curb-sign approval, purchase, posting, and removal to a named person.
- Confirm the approved destination use and any occupancy approval with the landlord and city.
- Separate packing, furniture assembly, and IT reconnection responsibilities in the agreement.
- Label equipment and furniture by destination room; back up business data before disconnection.
- Check the delivered inventory, record damage, and test workstations before staff return.
Frequently Asked Questions
How much should I budget for the move?
Get itemized mover quotes for your inventory, route, and building access; budget city curb-reservation fees separately. Madison lists $10 per meter for a half day or $18 for a full day, plus $2 per meter sign. Ask each mover to identify exclusions and extra-charge conditions. [1]
Can the mover arrange parking signs?
Ask the mover to include that task in writing. Madison requires the purchaser to post signs and remove them immediately after use. Non-metered temporary no-parking signs need posting at least 48 hours before the requested period for enforcement; meter signs need posting before occupancy. [1] [2]
Does moving into another office require a certificate of occupancy?
Confirm the approved use and proposed changes with Zoning. Madison says many new businesses do not need its zoning change-of-use process. For a new non-residential tenant in a previously occupied space, that process applies when the zoning use differs from the most recent approved use, no changes require building-code review, and no site changes are planned. Projects involving building-code review and a tenant change include the certificate in the building permit. [3]
Who should reconnect computers and printers?
Name the responsible IT person or provider in your move plan. Ask the mover to state whether its scope includes carrying devices, reconnecting them, or testing them. Arrange backups and connection tests before the move so you can check the finished office against an agreed list.
Sources and scope
This guide combines the sources below with practical planning guidance. Figures apply to the stated geography and period; request a written quote for your property.
