Concrete work in Longueuil: hiring and planning

Masters' Guild · Updated

For concrete work in Longueuil, request a written quote that separates repair or pouring from excavation, drainage and disposal, then verify who will perform each task. Québec’s RBQ subclass 3.2 covers specified concrete work but excludes excavation and drain installation. Before booking, settle municipal approvals, the work schedule, debris removal and instructions for using the finished surface. [3]

Define the problem and the proposed result

Tell the contractor what you need: a parking surface, patio, walking route, steps or repair to existing concrete. Provide measurements and photographs of the surface, nearby doors and surrounding ground. Point out standing water, uneven edges and changes you have noticed. Include the route the crew would use from the street.

Request a site inspection before accepting a repair or replacement proposal. For a repair, have the bidder define the treatment area, preparation method and limits of the promised result. For replacement, agree on the demolition boundary and ask how the contractor will prepare the ground and establish the finished elevation.

If the work involves steps, a foundation or a change beside the house, ask the bidder to identify any design questions they need resolved before pricing. Avoid choosing thickness, reinforcement or drainage details from a generic example. Require the contractor to describe the proposed specification for your site.

Check authorization for each task

The RBQ’s Québec-wide guidance identifies subclass 3.2 as Contractor – Small concrete works. Within its regulatory scope, it covers concrete placement, reinforcement, finishing, specified foundation formwork, patios adjacent to buildings and repair of concrete floors, slabs or sidewalks. The RBQ states that subclass 3.1 includes subclass 3.2 in its entirety. [3]

The RBQ excludes excavation, drain installation, foundation waterproofing and sewer or waterworks connections from the concrete works contractor’s authorized scope. If your project combines those tasks with a pour, require the bidder to name the responsible contractor and applicable licence authorization for each part. [3]

Request the business name and licence number, then use the RBQ’s contractor licence-check service. Ask who supervises subcontractors and who approves the prepared ground before concrete placement. Record those responsibilities in the agreement so you know whom to contact if the crews disagree about the scope. [3]

Obtain project-specific written quotes

Give each bidder the same project description. Ask the quote to identify dimensions, proposed thickness, base preparation, reinforcement, joints and finish. Request separate amounts or defined allowances for demolition, hauling, excavation and access equipment. Have the contractor list exclusions and explain how you will approve additional work discovered during removal.

Request a total that identifies taxes and any municipal charges you would pay. Read the payment schedule and warranty terms, including what the contractor promises to correct and how you report a problem. Assign responsibility for restoring disturbed landscaping and cleaning adjoining surfaces.

Before signing, agree on weather postponements and temporary access to your home. Ask for written instructions covering curing, foot traffic, vehicle use and surface care. If you need your entrance or parking space during the work, have the contractor describe the arrangement before setting the start date.

Confirm municipal approvals and scheduling

Describe the exact address and project to the City before booking. Include dimensions, the existing surface, proposed changes and any effect on a sidewalk, curb or street access. Ask which approvals apply, who must obtain them and whether the proposed truck, equipment or container placement needs separate authorization.

In its July 15, 2025 nuisance-regulation announcement, the City states that construction work is prohibited between 19:00 and 07:00. Confirm current requirements and applicable exceptions with the City before relying on those hours. Have the contractor account for demolition, cutting, deliveries and finishing in the proposed schedule. [1]

That announcement also says owners or contractors must store materials in containers as work progresses and must not leave debris or disordered materials on the site. Confirm the current conditions, then agree on container placement, cleanup and collection timing. Name the person responsible for keeping the site orderly throughout the job. [1]

Choose a disposal plan before demolition

Longueuil’s écocentre guidance limits the service to residential-origin waste and excludes commercial-origin waste. Each residential address has 12 free accesses per year. Before budgeting for municipal drop-off, confirm that your material and proposed delivery arrangement qualify, including any involvement by the contractor. [2]

The City requires a load smaller than 2.5 cubic metres and a vehicle no longer than 7.5 metres, including any trailer. It prohibits dump trailers and requires the resident to unload by hand. Bring proof of residence and the vehicle registration. Consider those conditions before volunteering to transport demolition material yourself. [2]

The City directs residents to check accepted materials by destination. Confirm which site accepts your concrete before loading a vehicle. If the contractor handles removal, put the receiving destination, hauling allowance and responsibility for rejected loads in the quote. Agree on whether removal happens during demolition or after the remaining work. [2]

Overnight construction restriction in the City’s July 2025 announcement

Overnight construction restriction in the City’s July 2025 announcement. Data table follows.
Ville de Longueuil · Announcement dated July 15, 2025; retrieved October 12, 2026. A two-entry clock timeline represents the announced 19:00 to 07:00 restriction across midnight. Hours use the 24-hour clock: 0 marks midnight at the start of a day and 24 marks midnight at its end. The two ranges split one overnight interval; they are not measured work durations or a survey. This dated announcement does not establish all current exceptions or amendments, or permission for every daytime activity. Confirm current requirements with the City. [1]
Overnight construction restriction in the City’s July 2025 announcement (h)
ItemRangeSource
After midnight0–7 [1]
Before midnight19–24 [1]

Local details that affect your job

Check the overnight restriction before booking

The City’s July 15, 2025 announcement states that construction work is prohibited between 19:00 and 07:00. Confirm current requirements and any exceptions with the City, then review the crew’s proposed start and finish times before accepting a date. [1]

Municipal drop-off needs a workable delivery plan

For eligible residential-origin waste, the City requires loads smaller than 2.5 cubic metres, vehicles no longer than 7.5 metres including a trailer, and manual unloading by the resident. It prohibits dump trailers. Confirm the material, receiving site and delivery eligibility before choosing municipal drop-off. [2]

Assign container storage and cleanup

The City’s July 2025 announcement says owners or contractors must store materials in containers as work progresses. Confirm current conditions and record where the contractor will store materials, who handles cleanup and when removal will occur. [1]

Resolve these questions before accepting a quote

Project componentRelevant guidanceYour next step
Concrete repair or finishingRBQ subclass 3.2 includes floor, slab and sidewalk repair within its regulatory scope.Check authorization and request a defined treatment area and method.
Pour with excavation or drainsSubclass 3.2 excludes excavation and drain installation.Identify the responsible contractor and authorization for those tasks.
Demolition with municipal drop-offÉcocentres exclude commercial-origin waste and impose delivery restrictions.Confirm material acceptance, eligibility and destination before loading.
Early or late constructionThe City’s July 2025 announcement states a restriction from 19:00 to 07:00.Confirm current requirements and exceptions before approving the schedule.
[1] [2] [3]

Your hiring checklist

  1. Photograph the damaged surface, surrounding ground and access route.
  2. Give bidders the same dimensions and intended use.
  3. Check the RBQ licence and authorization for each proposed task.
  4. Resolve municipal approvals and current scheduling conditions before booking.
  5. Record demolition boundaries, preparation, finish and change-approval terms.
  6. Name the disposal destination and assign hauling, container storage and cleanup.
  7. Request written curing, access and maintenance instructions.

Frequently Asked Questions

Does subclass 3.2 cover excavation for a new slab?

The RBQ excludes excavation, drain installation and foundation waterproofing from the concrete works contractor’s authorized scope. Ask who will perform any such tasks in your project and verify the applicable licence authorization. [3]

Can I take demolished concrete to an écocentre?

Confirm material acceptance and the receiving site with the City before loading. Municipal guidance limits service to residential-origin waste and requires loads smaller than 2.5 cubic metres, suitable vehicles and manual unloading by the resident. Confirm that your delivery arrangement qualifies. [2]

Can the crew start before 07:00?

The City’s July 15, 2025 announcement states that construction work is prohibited between 19:00 and 07:00. Confirm current requirements and any applicable exceptions with the City before agreeing to an early start. [1]

Do I need a permit for a patio or driveway?

Ask the City which approvals apply to your exact address and project. Describe the dimensions, existing surface, proposed changes and any effect on sidewalks, curbs or street access. Record who will obtain the required approvals before setting the start date.

Sources and scope

This guide combines the sources below with practical planning guidance. Figures apply to the stated geography and period; request a written quote for your property.

  1. Règlement sur les nuisances : propreté, bruit et règles d’utilisation des feuxVille de Longueuil · Ville de Longueuil · Checked 2026-10-12
  2. ÉcocentresVille de Longueuil · Longueuil municipal écocentre service · Checked 2026-10-12
  3. 3.2 Contractor – Small concrete worksRégie du bâtiment du Québec · Québec · Checked 2026-10-12