Local service guide
Bathroom Remodeling in Fargo, ND: Plan and Hire
For Bathroom Remodeling in Fargo, choose a contractor after you agree on the scope, compare written bids and assign responsibility for permits and inspections. North Dakota requires a state contractor license for jobs valued at $4,000 or more. Fargo requires permits for remodeling, plumbing, electrical and mechanical projects, while exempting certain finish work. Confirm your exact scope with Inspections before demolition. [1] [3]
Define the bathroom you need before requesting bids
Write down what you want to fix: a leaking shower, awkward storage, difficult tub access or worn finishes. Give bidders photos, room measurements and a list of items you want to retain. Ask them to quote a version that keeps the current fixture locations and a separate version for any proposed layout changes.
Specify the shower or tub, vanity size, storage, lighting and ventilation work. Ask the contractor to describe the proposed waterproofing system and who takes responsibility for its installation. For easier access, discuss the entry threshold, door opening, control placement and space for assistance before selecting fixtures.
For painting and new cabinets, Fargo's FAQ lists permit exemptions. The city requires permits for remodeling and structural alterations, plus mechanical, electrical, plumbing and Sheetrock work. Describe the entire project to Inspections rather than assuming that retaining the layout makes it exempt. [1]
Check the contractor and compare complete scopes
The North Dakota Attorney General says contractors doing jobs valued at $4,000 or more must hold a Secretary of State license. The office also advises checking all licenses required for the company and its crew. Ask for the legal business name and license number, then use the contractor list linked from the state's hiring guidance. [3]
Ask for references for bathrooms with a similar shower and scope. Request proof of insurance and the names of the people who will handle plumbing, electrical work and tile. Ask who coordinates them and who you contact if a fixture leaks after completion.
Get more than one bid and compare the included work. The Attorney General recommends a written contract covering the schedule, materials, subcontractors, warranties and responsibility for permits. For your bathroom, ask bidders to identify demolition, debris removal, wall repairs, waterproofing, fixtures, installation and exclusions. Request actual fixture selections or clear allowances before signing. [3]
Agree on price, changes and bathroom downtime
Build your budget from bids for your room. Ask each contractor to distinguish the agreed work from allowances and optional upgrades. Request a written process for hidden damage: stop the affected work, document the finding, price the repair and obtain your approval before proceeding.
Ask for a schedule showing demolition, trade work, inspections, wall closure and fixture installation. Establish when you will lose access to the toilet and shower. If this is your only bathroom, agree on an alternative before work starts. Confirm who receives deliveries and where crews can store materials.
Tie payments to described stages of work and record how you will approve changes. The Attorney General advises against full payment until the contractor has completed the work to your satisfaction. At handover, review the agreed work with the contractor and record any remaining corrections. [3]
Keep plumbing inspections ahead of wall closure
Fargo requires waste and vent lines to be inspected and tested before Sheetrock covers them. The city requires a final inspection after fixture installation and separate permits for building, electrical and mechanical work. Ask the contractor to identify these inspection stages in the schedule. [2]
Before approving wall closure, ask who arranged the city plumbing inspection and request confirmation that it took place. Confirm testing as well; do not treat the contractor's test as confirmation of the city inspection. Request photos of the open walls for your project records. Keep permit records, product information and warranty contacts together.
Choose shower fixtures with performance and bills in mind
EPA lists standard showerhead flow at 2.5 gallons per minute. WaterSense labeled models must use no more than 2.0 gallons per minute and meet independently certified performance requirements. Ask to compare spray coverage, controls and handheld options alongside the listed flow rate. [5]
Fargo's published water rates include a monthly minimum charge and an additional usage charge above 2,000 gallons. Residential sewer service carries a flat $25 monthly fee. When assessing fixture choices, distinguish reduced water use from a promised bill reduction; the residential sewer charge does not vary with gallons used under this published schedule. [4]
Fargo monthly minimum water charges by meter size

Local details that affect your job
Prepare a measured sketch for the permit application
Fargo accepts permit applications through its online portal or at City Hall, 225 4th Street North. The city asks for the project address, plans or drawings and a cost estimate; small projects can use a sketch with measurements. Ask the contractor who will submit the application, and settle that responsibility before work begins. [1]
Arrange the plumbing inspection before covering pipes
Fargo lists 701.241.1560 for plumbing inspection requests and says the inspector determines permit requirements onsite. Its residential and commercial plumbing guidance requires inspection and testing of waste and vent lines before Sheetrock covers them, followed by a final inspection after fixture installation. Put both stages into the contractor's schedule and request confirmation of the city inspections. [2]
Separate water use from the residential sewer fee
The city's published residential sewer charge is $25 per month. Water customers pay a meter-dependent minimum and additional charges for usage exceeding 2,000 gallons monthly. The city lists separate sewer billing rules for commercial and multifamily customers, so check your billing classification before applying the residential fee. Ask for the assumptions behind any claimed utility savings. [4]
Match your scope to the next planning step
| Proposed work | Local requirement or consideration | Next step |
|---|---|---|
| Painting and new cabinets | Fargo lists these as finish-work permit exemptions. | Describe any accompanying plumbing or wall work to Inspections. |
| Removing or replacing Sheetrock | Fargo requires a permit for Sheetrock work. | Include wall work in the application scope. |
| Replacing or moving plumbing | Fargo requires permits for plumbing projects and final inspection after fixture installation. | Assign permit and inspection responsibility before starting. |
| Opening walls around waste or vent piping | Fargo requires inspection and testing before Sheetrock covers these lines. | Arrange and confirm the city inspection before wall closure. |
| Adding electrical or mechanical work | These permits are separate from plumbing permits. | Ask the contractor to identify each required permit. |
Your hiring checklist
- Photograph the bathroom and prepare room measurements plus a retain-or-replace list.
- Ask bidders to price the same scope and list fixture allowances and exclusions.
- Request the business name, license information, insurance documentation and trade contacts.
- Assign responsibility for permit applications and city inspection scheduling in the contract.
- Agree on toilet and shower access during demolition and installation.
- Require written approval of the price and schedule for added repairs.
- Collect city inspection confirmation, warranty information and a list of remaining corrections at handover.
Frequently Asked Questions
Do I need a permit if I keep the bathroom layout?
Keeping the layout does not establish a permit exemption. Fargo requires permits for remodeling, plumbing, electrical, mechanical and Sheetrock work, while exempting painting and finish work such as new cabinets. Give Inspections the full scope and ask which permits apply. [1]
What should the bathroom contract include?
Include the scope, start and completion expectations, material selections, payment terms, subcontractor names and license numbers, warranties and permit responsibility. The Attorney General recommends these contract details. Add your process for approving hidden-damage repairs and changes. [3]
Can the crew close the walls before the plumbing inspection?
Fargo requires waste and vent lines to be inspected and tested before Sheetrock covers them. Ask the contractor to confirm completion of the city inspection and testing before approving wall closure. The city also requires a final inspection after fixture installation. [2]
Will an efficient showerhead lower both water and sewer charges?
WaterSense showerheads must use no more than 2.0 gallons per minute. Your water bill effect depends on usage and Fargo's minimum-charge structure. Under the published schedule, residential sewer service has a flat $25 monthly charge, so reduced shower use does not lower that fee. Check your classification if you receive multifamily billing. [4] [5]
Sources and scope
This guide combines the sources below with practical planning guidance. Figures apply to the stated geography and period; request a written quote for your property.
