Local service guide
Office Relocation and Setup in Calgary
For Office Relocation and Setup in Calgary, choose a mover who puts your inventory, building access, packing, furniture assembly and equipment handling in a written quote. Before committing to a move date, confirm the new premises’ approvals and assign responsibility for curb access. Calgary treats a business relocation like a new licence application with new approvals and inspections. [2]
Define the work before comparing quotes
Prepare an inventory by destination room or workstation. Include desks, chairs, shelving, filing cabinets, printers, monitors and equipment that needs special handling. Photograph furniture connections and label parts you want the crew to reassemble. Give bidders dimensions for large pieces and flag anything you want stored, disposed of or left behind.
Ask each mover to list separate charges for packing, transport, taking items out of boxes and furniture assembly. Specify whether the crew must place furniture to a floor plan, reconnect desktop equipment or remove packing materials. Name your IT lead and agree who will disconnect, transport, reconnect and test computers, phones and network equipment.
Obtain a written quote for your inventory and access arrangements. Ask about crew and truck charges, minimum billable time, travel, waiting time, materials, storage, after-hours work and taxes. Have the mover explain whether the price is fixed or depends on hours worked, and require your written approval before adding tasks or charges.
Confirm access at both buildings
Ask both property managers about loading docks, freight elevators, booking windows, truck clearance, floor protection and insurance documentation. Walk the route from the truck to the office with the mover. Record who will unlock doors and supervise access, plus a contact for delays outside normal office hours.
Calgary requires a street use permit for exclusive use of a City road right-of-way, including streets, sidewalks and alleys. The City lists loading and unloading equipment, placing moving containers and reserving space for moving among the permit uses. Check whether your proposed loading arrangement needs approval before booking public space into the move plan. [1]
The City issues temporary no parking permits in conjunction with street use permits. The permit holder must obtain signage from an authorized third party and install it at least 12 hours ahead. ParkPlus parking fees apply when the restriction occupies a paid parking area. Ask the mover to identify who handles applications, signs and parking charges. [1]
Match the move date to premises approvals
Ask the Planning Services Centre whether the proposed office activity suits the new address and which approvals you need. Calgary treats a physical business move like a new licence application. The City charges no base licence fee for a move, but applicable planning and fire approval fees still apply. [2]
Separate furniture placement from alterations to the premises when describing your plans to the City. Calgary exempts wholly cosmetic work, such as painting or furniture, from building permits when its other listed permit triggers do not apply. Wall alterations, changes to building classification or occupant load, and some equipment changes can require building approval. Mechanical, plumbing, gas or electrical changes may also require additional trade permits. [3]
If you plan alterations, ask your contractor to confirm permits, inspections and any occupancy approval before scheduling furniture delivery. The City publishes a typical interior-renovation building-permit review period of 21 to 49 days, depending on complexity and application completeness. Use that review estimate in your planning and confirm progress before committing to delivery. [3]
Check the mover and agree on completion checks
Ask for the contracting company’s legal name, written insurance information, coverage limits and damage-claim procedure. Describe equipment values and ask how the mover will handle fragile items and confidential files. Confirm who performs the work if the bidder uses another carrier or crew.
For Alberta carriers, Safety Fitness Certificate requirements include commercial vehicles registered at 11,794 kg or more that operate within Alberta, and vehicles registered above 4,500 kg that operate in multiple provinces, territories or states. Ask which requirement applies to the truck operator. Interested parties can request an Alberta public carrier profile; online reports are free, but access requires an account and a motor vehicle identification number. [4]
Choose a staff-return time that leaves room for your setup checks. Back up data before disconnection, keep an equipment inventory and assign someone to test internet access, phones, printers and essential applications. Walk through both offices with the crew, photograph damage, record missing items and agree how the mover will resolve unfinished work.
Calgary street-use minimum application lead times

Local details that affect your job
Allow time for downtown curb approvals
Calgary’s minimum street-use review periods start after you submit a complete, compliant application: 5 business days for lower-impact closures, 10 for moderate-impact closures and 15 for high-impact closures. The City includes downtown work in the high-impact category. Confirm the category for your loading plan before accepting a downtown move date; revisions can extend review. [1]
Arrange the business licence fire inspection
Calgary requires a Fire Prevention Bureau inspection before issuing a business licence for commercial premises. Apply for the licence and obtain your business identification number before booking. The City directs businesses to contact the bureau at least five business days before their opening date. Coordinate this with your move and setup schedule. [2]
Check suitability before committing to the space
The Planning Services Centre can help determine whether the new location suits your business and what approvals you need. Reach the centre at 403-268-5311 or visit the third floor of the Municipal Building, 800 Macleod Trail SE. Give staff the address, business activity and proposed alterations so they can assess the relevant requirements. [2] [3]
Choose the next step for your move
| Situation | Next step | Question to resolve |
|---|---|---|
| Furniture placement with no other permit triggers | Confirm that the scope meets the City’s cosmetic-work exception. | Does the quote cover assembly and placement to the floor plan? |
| Wall alterations or changes to building systems | Confirm building and trade permit requirements with the City and contractor. | Who confirms the premises are ready for delivery? |
| Temporary public curb parking restriction | Arrange street use and temporary no parking permits together. | Who obtains signs and installs them at least 12 hours ahead? |
| Physical business address change | Apply to move the business and complete required approvals and inspections. | Does the opening schedule allow for the licence fire inspection? |
| Mover operating regulated trucks | Check Safety Fitness Certificate applicability and consider a public carrier profile. | Which company operates the trucks? |
Your hiring checklist
- Send bidders one inventory, destination floor plan and list of excluded items.
- Confirm loading dock and freight elevator arrangements at both addresses.
- Assign responsibility for permit applications, signage and curb charges.
- Ask the City which approvals the new premises require.
- Obtain written scope, charges, insurance details and damage-claim terms.
- Assign an IT lead for backup, disconnection and equipment testing.
- Record furniture placement, missing items and unfinished work before accepting completion.
Frequently Asked Questions
Does moving desks require a building permit?
Calgary exempts furniture or other wholly cosmetic work from building permits when its other permit criteria do not apply. Check the full scope: wall changes, a new building classification or occupant load, and some equipment changes can trigger approval requirements. [3]
Can the mover reserve parking with cones?
For a temporary curb parking restriction, Calgary requires a temporary no parking permit together with a street use permit. The permit holder must obtain authorized third-party signage, install it at least 12 hours ahead and display the approved dates and times for enforcement. [1]
Is a business move just an address update?
Calgary distinguishes a physical move from a mailing-address change. A physical relocation requires a move application with new approvals and inspections. If you change your mailing address without moving the business, the City permits a free business-licence update. [2]
What should office setup include in the quote?
Ask for a task list covering furniture assembly, placement, taking items out of boxes and removing packing materials. Assign equipment reconnection and testing to named people. Define the completion checks and who resolves unfinished work before signing.
Sources and scope
This guide combines the sources below with practical planning guidance. Figures apply to the stated geography and period; request a written quote for your property.
