Concrete work in Burnaby: quotes and permits

Masters' Guild · Updated

For concrete work in Burnaby, choose a contractor who inspects your site and gives you a written scope covering removal, preparation, drainage, the pour and delivery access. Assign permit responsibilities before agreeing to a start date. The City requires a permit to build or widen a driveway and a Traffic Control Permit for temporary traffic changes or closures on City right-of-way. Have each bidder identify who handles applications, fees and inspections. [1] [2]

Define the work before comparing quotes

Describe how you intend to use the surface: vehicle parking, a walking route, patio space or entrance access. Give bidders photographs, approximate dimensions and notes about ponding, cracks or uneven areas. During the site visit, ask them to explain their proposed repair, levelling or replacement method and which defects it will address.

For repairs, record which defects the contractor will fix and which will remain. For replacement, request a drawing or marked photograph showing the removal area, new edges, finished elevations and connections to existing surfaces. Give each bidder the same scope so you can compare the offers.

Resolve driveway approvals before excavation

Burnaby requires a permit to build or widen a driveway. The City permits one driveway for single-family homes and most residentially zoned properties, regardless of secondary suites or the number of residents. It directs access to a lane when available. On corner properties without a lane, owners must use the minor street unless the Traffic Division approves an exception. [1]

Builders or owners must submit a detailed building and site plan to the Building Department. Include existing and proposed driveways and parking, driveways to remove, proposed location, width and elevations, and nearby trees, hydro poles, lamp standards or hydrants. For projects with no other construction or only minor driveway adjustments, applicants can apply directly to the Transportation Division. [1]

Separate private driveway work from crossing work in your quote. The City assigns owners the cost of new crossings, redundant crossing removal and removal or relocation of access obstructions. Engineering must approve relocations or removals. Resolve these items before accepting a proposal for a wider entrance. [1]

Discuss drainage during the site visit

Show the contractor where water collects and where roof downpipes discharge. Review proposed surface slopes, drainage connections and finished levels beside doors and the foundation. Ask how the contractor intends to manage runoff and preserve access to drains after completing the work.

The City explains that perimeter pipes collect water from the house and property and carry it to the storm sewer. It advises homeowners to inspect, flush or clean these drains because debris and roots can block them. It also warns that roof downpipes in older homes may overload perimeter pipes. Discuss whether to commission a drainage assessment before approving concrete near the foundation. [4]

Confirm permits and delivery access

Confirm the Building Permit path for concrete associated with a building or structure. The City's home-improvement guidance requires permits for construction involving excavation, erection, enlargement, alteration or removal of buildings or structures. It exempts minor non-structural repairs to the outside of your home from Building Permit requirements. This exemption does not establish an exemption from traffic-control or other applicable approvals, or settle the status of standalone patio repairs. [3] [2]

Since July 1, 2026, some projects require a Development Permit before applicants can submit or receive a Building Permit. Give the Building Department your proposed scope and confirm the approval sequence before setting the construction date. [3]

Temporary traffic changes or closures of roads, lanes, sidewalks, paths or cycling facilities on City right-of-way require a Traffic Control Permit. The City states a minimum review period of 15 business days after applicants submit all required documents. Applicants must provide a traffic management plan, insurance documentation and proof of WorkSafeBC registration with an up-to-date clearance letter. [2]

Review where the crew will place delivery trucks, pump equipment and demolition materials. The City also identifies a standard street works permit requirement for concrete works on City right-of-way or City-controlled or owned property. Ask the contractor to confirm construction approvals alongside traffic-control arrangements. [2]

Compare price, schedule and handover

Use itemized quotes for your specific site to set the budget. Request removal and disposal, excavation, base preparation, concrete dimensions and thickness, reinforcement, finish, joints, drainage work and site restoration. Ask bidders to list exclusions, taxes and delivery or equipment charges. Identify who pays municipal fees and handles additional application work.

Agree on payment stages and a written process for approving extra work. Cover unsuitable ground discovered during excavation, weather delays and changes to the approved layout. Before the pour, get the contractor's protection and curing plan, plus written instructions for when you may walk or drive on the surface. Include cleanup, inspection responsibilities and warranty terms in the agreement.

Burnaby Traffic Control Permit application fees

Burnaby Traffic Control Permit application fees. Data table follows.
City of Burnaby, BC · Effective January 1, 2026; retrieved October 12, 2026. These published municipal fees cover one application per project for each of the three traffic-control categories, in Canadian dollars. They are a fee schedule, not a sample of contractor quotes. Applicants assess the entire project scope and duration to determine the category; City staff may increase it during review. Use these figures to budget the application expense when traffic control applies. They exclude separate weekly permit fees, contractor traffic-management charges and concrete construction costs, and do not establish a typical installed project price. [2]
Burnaby Traffic Control Permit application fees (CAD)
ItemValueSource
Category 1285 [2]
Category 2571 [2]
Category 31142 [2]

Local details that affect your job

Check lane access before paying for a widening design

Burnaby directs driveway access to a lane when available and requires proposed widths and elevations in the site plan. For projects involving no other construction or only minor driveway adjustments, owners can apply directly to the Transportation Division. Resolve the access route before commissioning the layout. Engineering General Inquiries is 604-294-7460. [1]

Allow additional time for temporary parking signs

When your project needs temporary parking signs, include installation in the delivery schedule. Beyond Traffic Control Permit review, Burnaby requires an additional five business days to install the signs. The City requires installation 24 hours before parking regulation signs become legally enforceable. Confirm this timing before reserving delivery equipment. [2]

Match your project to the next step

Your projectNext stepConfirm with the contractor
Build or widen a drivewayCheck crossing approval and lane-access rules before choosing the layout.Who prepares the site plan and includes crossing costs?
Minor non-structural repair to the outside of your homeThe City exempts this scope from Building Permit requirements. Confirm that the work fits this exemption and check other applicable approvals.Does the proposal extend beyond minor non-structural repair or affect City right-of-way?
Standalone concrete patio repairThe City's home-improvement guidance does not specifically determine this case. Ask the Building Department to assess the scope.What removal, excavation or structural work does the proposal include?
Concrete associated with an addition or structureConfirm Building Permit requirements and whether a Development Permit must come first.Who coordinates drawings and inspections?
Delivery or equipment changes traffic on City right-of-wayConfirm Traffic Control Permit requirements and allow for review.Where will trucks stand, and who manages public access?
[1] [2] [3]

Your hiring checklist

  1. Photograph cracks, uneven surfaces, ponding and the proposed delivery route.
  2. Mark the work area and describe its intended use.
  3. Request an explanation of the proposed repair or replacement method.
  4. Assign responsibility for permit checks, applications, fees and inspections.
  5. Review drainage, finished elevations and connections to existing surfaces.
  6. Compare itemized scopes, exclusions and allowances for unexpected excavation work.
  7. Agree on payment stages, weather delays, curing instructions and handover requirements.

Frequently Asked Questions

Does a standalone concrete patio repair need a Building Permit?

The City's home-improvement guidance does not specifically determine whether a standalone concrete patio repair needs a Building Permit. Its stated exemption covers minor non-structural repairs to the outside of your home. Give the Building Department the proposed patio scope, including removal and excavation, and ask staff to assess it before work starts. [3]

Can I add a second driveway for a secondary suite?

Burnaby permits one driveway for single-family homes and most residentially zoned properties regardless of secondary suites or the number of residents. Check your zoning and proposed access with the City before commissioning a layout. [1]

Do the chart fees cover the concrete job?

The chart shows the City's one-time Traffic Control Permit application fees by project category. The City charges separate permit fees based on affected transportation infrastructure and duration. Ask your contractor to separate municipal fees, traffic-management charges and concrete construction costs in the quote. [2]

What should I discuss about water beside the house?

Review surface slopes, downpipe discharge and access to existing drains with the contractor. The City advises homeowners to inspect and clean perimeter pipes and warns that roof downpipes in older homes may overload them. Decide whether to include a drainage assessment in your scope. [4]

Sources and scope

This guide combines the sources below with practical planning guidance. Figures apply to the stated geography and period; request a written quote for your property.

  1. Driveway CrossingCity of Burnaby · Burnaby, BC · Checked 2026-10-12
  2. Traffic Control PermitCity of Burnaby · Burnaby, BC · Checked 2026-10-12
  3. Home Improvement PermitsCity of Burnaby · Burnaby, BC · Checked 2026-10-12
  4. Flood PreventionCity of Burnaby · Burnaby, BC · Checked 2026-10-12