Office Relocation and Setup in Aurora, CO
Arrange Office Relocation and Setup by hiring a mover against a written inventory and placement plan, assigning an IT lead, and confirming destination readiness before committing to a move date. For an Aurora office buildout, coordinate required inspections and any certificate of occupancy with your contractor and the city. Assign the business-license location change to your business administrator. [1] [2]
Choose a mover around the work you need completed
Start with a room-by-room inventory: desks, chairs, filing cabinets, boxed records, monitors, printers, and equipment that needs special handling. Give bidders a destination floor plan with room names and workstation labels. Ask them to explain how they will protect furniture, floors, doorways, and equipment during the move.
Define setup in the quote. Specify furniture disassembly and assembly, cabinet placement, removal of items from boxes, and collection of packing materials. Assign computer disconnects, network connections, and equipment testing to named people. Ask whether the mover uses subcontractors, request evidence of insurance, and review damage coverage, exclusions, and the claims process.
Compare written quotes with the same scope
Request a walkthrough or a detailed inventory review before choosing a bidder. Ask for the crew size, truck arrangements, minimum charge, billing basis, and treatment of waiting time. Have the bidder identify charges for stairs, long carries, packing supplies, storage, after-hours work, and return visits. Compare the work included alongside the quoted amount.
Ask the mover to record assumptions about elevator access, dock reservations, and how much packing you will complete. Include a written process for approving extra work and terms for cancellation or rescheduling. Set your budget from written quotes for your inventory and access conditions. Request separate amounts for optional work so you can remove it without changing the core moving plan.
Set the move date around destination readiness
For a destination that needs construction, ask your landlord or contractor to confirm the review category, permit status, remaining inspections, and occupancy requirements. Aurora lists tenant-finish building plan review at four total working days, excluding consultant correction time. The city requires completion of other development-review processes before issuing building permits. Treat that review figure as a planning reference rather than a promised move-in date. [3]
Aurora requires the general contractor to obtain applicable building inspections before the city issues a certificate of occupancy. These include structural, electrical, HVAC, plumbing, and life-safety inspections as applicable. Ask your contractor and the city which requirements apply to your suite. Schedule a readiness check before the mover's deadline for changing the booking. [2]
Plan the business-license paperwork alongside the physical move. Aurora requires businesses conducting activities or employing people in the city to hold a business license, with a separate license for each location. For a license location transfer, submit the change through the Licensing Portal and confirm the new-license requirements with the Licensing Section. [1]
Confirm loading access at both buildings
Ask both property managers to approve the loading position, freight-elevator booking, access hours, door clearances, and required insurance documents. Give the mover photographs or measurements of tight turns and oversized furniture. Name one person at each building who can unlock doors and resolve access problems during the move.
If your proposed loading arrangement could affect public streets, sidewalks, or alleys, ask Aurora whether it constitutes a traffic work zone and what approval it needs. The city requires a traffic control plan as part of the permit application for such work zones. For traffic work zones on private roads, the city directs applicants to the road owner or developer for review and approval. [4]
Assign IT work and test before employees return
Have your IT lead confirm internet installation, network equipment placement, backups, and the shutdown sequence before packing starts. Label devices and cables by destination workstation. Agree who transports sensitive equipment and records, who holds keys or credentials, and who signs for delivery. Keep confidential documents under an assigned person's control.
Before employees return, have the move lead check the furniture inventory and photograph damage. Have IT test business applications, internet access, phones, printers, and remote access. Record missing items and unresolved faults with a responsible person and follow-up date. For a phased move, identify which staff can work remotely and which equipment must remain available until the final shutdown.
Aurora published building plan-review totals

Local details that affect your job
Submit the license location change
Aurora requires a change-of-location submission through its Licensing Portal and issuance of a new license when transferring a license between locations. The city states that this transfer requires an application fee only, subject to the provisions for the particular license. Assign the submission to your business administrator and confirm the applicable process with the Licensing Section at 303.739.7057. [1]
Coordinate inspection requests before scheduling setup
For permitted buildout work, Aurora accepts emailed inspection requests until 4:30 p.m. Monday through Friday. Include the permit number, address, suite number if applicable, inspection type, and phone number. The city grants weekend and overtime inspections based on justification and staff availability and charges hourly inspection rates. Confirm inspection arrangements with your contractor before planning a weekend reopening. [2]
Check street-impact hours before choosing an evening move
For traffic work zones on arterial and collector streets, Aurora lists standard impact hours as Monday through Friday, 8:30 a.m. to 3:30 p.m. MST, unless the city approves written justification. The city doubles daily fees for work outside standard hours. Confirm whether these rules apply to your loading proposal before contracting for an evening move that depends on street access. [4]
Match the move plan to the destination
| Your situation | Planning choice | Next step |
|---|---|---|
| Existing suite with no planned construction | Confirm suite readiness and building access | Ask the landlord and city which occupancy requirements apply; complete the license location-change process. |
| Suite undergoing tenant-finish work | Keep the move date conditional on construction readiness | Confirm permits and remaining inspections; allow time beyond the published city review schedule. |
| Loading proposal affects public right of way | Resolve city coordination before booking work that depends on street access | Ask whether the proposal creates a traffic work zone and requires a traffic control plan. |
| Weekend setup depends on unfinished inspections | Confirm inspection availability before committing | Ask the contractor to arrange required inspections; the city grants weekend inspections based on justification and staff availability. |
Your hiring checklist
- Prepare one inventory and labeled destination floor plan for all bidders.
- Assign moving, furniture assembly, box emptying, and IT work in writing.
- Confirm dock, elevator, door, and loading access at both addresses.
- Check destination permit, inspection, and occupancy status with the contractor and city.
- Assign the business-license location change to a named person.
- Agree on rescheduling terms, extra-work approval, damage coverage, and claims procedures.
- Complete backups and record the equipment shutdown and restart sequence.
- Inspect deliveries and test essential systems before employees return.
Frequently Asked Questions
Does the mover's setup service include reconnecting computers?
Ask the bidder to define setup in writing. Assign disconnects, transport, reconnection, and testing to named people. If you use a separate IT provider, agree on the transfer of equipment and the time each provider needs access before move day.
Does an Aurora business license follow us to the new office?
Aurora requires a change-of-location submission through the Licensing Portal and issuance of a new license for a location transfer. It also requires a separate license for each location within the city. [1]
Can we use the tenant-finish review time to set our opening date?
Use it as a planning reference. Aurora lists four total working days for tenant-finish building plan review, excluding consultant correction time. Other development reviews must finish before permit issuance. Ask your contractor to account for construction and required inspections before you commit to an opening date. [2] [3]
Do we need a traffic control plan for the moving truck?
Confirm the specific loading proposal with Aurora. The city requires a traffic control plan for traffic work zones affecting public streets, sidewalks, or alleys. Its guidance does not establish that every moving-truck stop creates such a work zone. [4]