Local service guide
Lighting Installation in Aurora, CO: Hiring Guide
For Lighting Installation in Aurora, CO, define whether you want to replace an existing fixture or add lighting in a new location, then request a written scope and check the contractor through the city's lookup. Aurora requires current Colorado master and contractor credentials on file for electrical contractors. Before you approve work, ask who will confirm permit requirements, arrange inspections, and handle any ceiling repairs. [2]
Define the job before requesting quotes
Describe each lighting location and say whether you want to keep it, move it, or add another. For an existing ceiling light, send a room photo and the replacement fixture's model, dimensions, and weight. For new recessed lights or pendants, mark your preferred positions on a photo and ask the electrician to assess them before you order.
Include ceiling height, access above the room, and your preferred switch locations in the request. Ask the installer to explain how they will check fixture support and what access they need. Have them identify any openings they expect to make and name who will patch and paint afterward.
Separate a brightness problem from a layout change. If you like the existing fixture and its location, ask whether a suitable lamp can meet your goal. DOE advises buyers to compare lumens for visible light output; wattage measures power input. Use those specifications when explaining what feels too dim. [3]
Check credentials and permit responsibility
Aurora requires electricians to have a current Colorado master's and contractor's license on file with its Building Division. The city does not issue a separate electrical contractor license. Use the contractor lookup on the city's licensing page, and ask the business to identify the credentials associated with your job. [2]
Ask about permits using your actual scope: replacing a fixture at its existing location, adding recessed lights, moving a switch, or installing new wiring. Aurora's Building Permit Center accepts code questions and helps with permit status and inspection scheduling at 303.739.7420. Confirm the requirement for your project before scheduling work. [1]
Put permit handling and inspection scheduling in the written agreement. For new electrical permit applications, the city states that it reviews and inspects work under the 2026 National Electrical Code following its August 1, 2026 transition. Ask the contractor to account for the applicable requirements before you commit to a layout or installation date. [1]
Choose lamps and controls together
Use lumens to compare brightness and Kelvin to compare light color. DOE's purchasing guide lists 2,700 K as warm and 3,000 K as soft, with homes among the applications for both. Try your preferred color in the room before ordering a full set, especially if nearby lamps will remain. [3]
For dimming, check both the lamp's dimmable designation and its compatibility with the proposed dimmer. DOE advises buyers to confirm that LEDs work with the dimming system. Give the installer the exact lamp or fixture model and the existing dimmer model; ask them to include any control replacement in the quote. [3]
For a fully enclosed fixture, check the lamp packaging or technical specifications for approval for that application. DOE explains that trapped heat can affect some LED products' performance and life expectancy. Ask about lamp fit, too, because some LED lamps are larger near the base than incandescent lamps. [3]
If you want motion or occupancy controls, discuss their behavior before installation: where detection should occur, how long the light should stay on, and how you will override it. DOE describes LED integration with occupancy sensing, daylight harvesting, and local light-level controls. Ask the installer to demonstrate the settings at handover. [4]
Compare written scope and finish the handover
Request a total for the agreed work and identify allowances or exclusions. Ask whether the price includes fixture assembly, removal of old fixtures, controls, permit handling, cleanup, and wall or ceiling repairs. If you supply the fixtures, agree on who handles missing parts, returns, and product warranty questions.
For new wiring or uncertain access, ask what the contractor needs to inspect before giving a firm quote. Require your approval for changes beyond the written scope. Compare bids using the same fixture list and repair responsibilities; ask each bidder to explain any difference.
Before signing off, operate each light and control with the installer. Check the appearance from your usual seating and work positions, test the agreed dimming behavior, and review sensor settings. Keep model numbers, warranty documents, the final invoice, and any permit or inspection records together.
LED power ranges at four brightness levels: national reference

Local details that affect your job
Verify state credentials on file with Aurora
Aurora requires a current Colorado master's and contractor's license on file for electricians and does not issue a separate electrical contractor license. Before accepting a bid, use the city's contractor lookup and resolve any mismatch between the listed business and the name on your quote with the Building Division. [2]
Plan around the city's electrical-code transition
Aurora transitioned to the 2026 National Electrical Code effective August 1, 2026. The city says new electrical permit applications receive review and inspection under those requirements. For a project involving new lighting wiring, ask the contractor which requirements apply and confirm scope questions with the Permit Center at 303.739.7420 before scheduling. [1]
Match your lighting goal to the quote request
| Your goal | Information to provide | Question before approval |
|---|---|---|
| Replace an existing ceiling fixture | Existing location, ceiling height, new fixture model and weight | Will you assess the existing box and support, and specify any corrective work? |
| Add or relocate lights | Marked room photo, preferred positions, switch locations | Who confirms permit requirements and handles access openings and repairs? |
| Add LED dimming | Exact lamp or fixture model and current dimmer model | Have you confirmed compatibility between the LED product and dimming system? |
| Use lamps in an enclosed fixture | Fixture model and proposed lamp specifications | Does the lamp manufacturer approve use in a fully enclosed fixture? |
Your hiring checklist
- List each fixture location and mark replacements, relocations, and additions.
- Send room photos, ceiling heights, and fixture model numbers before requesting a quote.
- Check the contractor through Aurora's licensing page and clarify the credentials associated with the job.
- Ask the Permit Center about your exact scope and assign permit and inspection responsibilities in writing.
- Confirm brightness, light color, enclosed-fixture suitability, and dimmer compatibility before ordering.
- Agree on access openings, patching, painting, cleanup, and approval of extra work.
- Test lights and controls with the installer and retain the invoice and project records.
Frequently Asked Questions
Do I need a permit to replace a light fixture?
Ask Aurora's Building Permit Center at 303.739.7420 whether your specific replacement requires a permit before scheduling work. Describe whether you are keeping the location and wiring or adding or moving equipment. Agree with the contractor on who will handle any required permit and inspection. [1]
Does Aurora issue electrical contractor licenses?
Aurora does not issue a separate electrical contractor license. It requires current Colorado master and contractor credentials on file with the Building Division. Use the city's contractor lookup before hiring. [2]
Can I keep my dimmer when switching to LEDs?
Ask the installer to check the exact products. DOE advises buyers to confirm both dimming capability and compatibility with the dimming system. Include a replacement dimmer in the quote if the proposed combination needs one. [3]
How much will installation cost?
Request a project quote after sharing the fixture list, locations, access, and repair expectations. Ask bidders to separate fixtures and controls from installation and permit handling. Compare offers against the same written scope, and ask which items carry a fixed price and which require an allowance.
Sources and scope
This guide combines the sources below with practical planning guidance. Figures apply to the stated geography and period; request a written quote for your property.
