Concrete work in Albuquerque starts with a written scope: identify the driveway, patio, steps or sidewalk you want repaired or replaced, then ask contractors to explain drainage, access and permit responsibilities before accepting a bid. New Mexico requires licensing for construction-related contracting. For work affecting public sidewalks or street traffic, check the city's right-of-way process before setting a start date; the city requires applications at least 14 calendar days ahead. [1] [4]

Define the project before requesting bids

Photograph the full work area, close-ups of damage and the connection to the street or house. Measure the proposed footprint and describe how you use it: parking vehicles, moving bins, walking to the door or placing patio furniture. Give each bidder the same scope and request a site visit.

For repair or leveling, ask the contractor to explain the cause of the damage and why the proposed treatment fits. For replacement, request a drawing showing demolition limits, finished elevations and intended drainage direction. If you want a larger driveway or patio, request separate prices for replacement within the existing footprint and for expansion.

Record anything you want preserved, including irrigation lines, gates, landscaping and adjoining concrete. Agree on who will handle damage to those items and how you will approve changes to the scope. Keep that agreement with the estimate.

Check street and sidewalk responsibilities

Albuquerque's Construction Coordination Section manages activities in public right-of-way, including excavation and barricade permits. The city requires certified individuals to barricade activities that alter or interfere with pedestrian or vehicle traffic. Ask the contractor whether demolition, truck placement, a dumpster or the work itself will affect that traffic. [1]

Assign responsibility for the application, supporting documents and traffic control in the contract. The city may require licensing documentation, bonds or certificates depending on the activity. Its application page includes contractor procedures and a sidewalk, curb and gutter bond form. Call Construction Services at 505-924-3400 if the proposed work or closure is unclear. [1]

Before removing your existing access, ask the contractor to confirm approval and the permitted work arrangements. Agree on where you will park and how household members will reach the entrance during construction. Include any access needs in the bid request so contractors can account for them.

Resolve drainage before approving the pour

The city's Hydrology Section determines storm drainage requirements for development projects and reviews grading and drainage plans associated with building, paving and grading permits. If your proposal changes elevations, drainage routes or a connection toward the street, ask Hydrology what review applies to your address and scope. [2]

For a private drainage connection within public right-of-way, the city requires an SO-19 permit. Applicants submit a grading and drainage plan to Hydrology with the standard SO-19 notes. Ask the bidder to identify any proposed street-side drainage connection and name who will prepare the required plan. [2]

You can look for existing grading and drainage records through the city's Advanced Map Viewer. The Hydrology page explains how to open the Grading and Drainage Plans layer under Planning Research, find the property and access its document link. Share relevant records with the contractor and ask how the proposed work fits the documented drainage arrangement. [2]

Compare complete costs

Ask each contractor to separate removal and disposal, excavation, base preparation, slab thickness, reinforcement, finish, joints and cleanup. Request permit charges and traffic-control services as separate items. Ask whether the price includes applicable taxes and how you will approve unexpected work after demolition.

The city lists an excavation permit fee of $42 for excavation not exceeding 660 feet. Its fee schedule also lists additional charges for curb cuts, drive pads and other work. These municipal charges describe permit-related costs; they do not establish a concrete installation price. [3]

The city lists residential sidewalk closures at $21 per month and arterial or collector sidewalk closures at $21 per day. Ask the contractor which closure category applies and to separate city charges from traffic-control equipment and service charges in the estimate. [3]

Check credentials and agree on handover

New Mexico's Construction Industries Division states that construction-related contractors must hold a license and identifies PSI as its licensing and examination service provider. Request the license number and business name, check current status and confirm the appropriate classification for the project. Ask for evidence of insurance as part of your hiring review. [4]

Before signing, agree on payment stages, change approval and the person you can contact during the work. Request written instructions for curing, surface protection and reopening to foot or vehicle traffic. Ask the contractor to explain the warranty, exclusions and process for reporting a problem.

Walk the finished area with the contractor before accepting completion. Compare it with the agreed drawing and scope, photograph the result and record unfinished items. Keep the contract, change orders, permit records and care instructions together.

Two Albuquerque additional excavation charges per item

Two Albuquerque additional excavation charges per item. Data table follows.
City of Albuquerque, New Mexico · Fee schedule retrieved October 12, 2026; effective date not stated. Two selected additional excavation fees from the city's published fee table, expressed in US dollars per item. The table specifies $12 for each curb cut and $6 for each drive pad. This is a selection of municipal charges, not a survey of contractor prices or a complete permit total. Other excavation and barricading charges may apply. The source does not state an effective date; confirm applicable fees with Construction Services before accepting a bid. [3]
Two Albuquerque additional excavation charges per item (USD)
ItemValueSource
Curb cut12 [3]
Drive pad6 [3]

Local details that affect your job

Right-of-way work changes the booking schedule

Albuquerque requires right-of-way applications at least 14 calendar days before the anticipated start date. If your work interferes with sidewalk or street traffic, ask the contractor to include certified barricading and identify required documents before promising a demolition date. Construction Services answers scope and documentation questions at 505-924-3400. [1]

A street-side drainage outlet needs a separate check

Albuquerque requires an SO-19 permit for connecting private drainage within public right-of-way, with a grading and drainage plan submitted to Hydrology. If the contractor proposes such a connection, settle plan preparation and approval responsibilities before accepting the bid. For Hydrology questions, the city lists 505-924-3695. [2]

Choose the next step for your concrete project

Project situationNext stepAsk the bidder
Repairing damaged concreteRequest an explanation of the damage and proposed treatment before choosing repair or replacement.What cause will you address, and what work will remain outside the repair?
Work affects public sidewalk or street trafficCheck the right-of-way process and plan for the city's 14-calendar-day application deadline.Who applies, supplies the required documents and arranges certified barricading?
Proposed private drainage connection in public right-of-wayContact Hydrology about the SO-19 permit and grading and drainage plan.Who prepares the plan and obtains approval for this connection?
Replacement or expansion with changed elevationsAsk Hydrology what drainage review applies and request a drawing before approving the scope.Where will runoff go, and what existing drainage records have you reviewed?
[1] [2]

Your hiring checklist

  1. Photograph damage and measure the proposed work area.
  2. Give bidders the same repair, replacement or expansion scope.
  3. Request the license number, classification and evidence of insurance.
  4. Ask the contractor to mark finished elevations and drainage direction.
  5. Assign permit applications, supporting documents and traffic control in writing.
  6. Separate construction costs, city charges and contractor traffic-control charges.
  7. Agree on parking, entrance access, payment stages and change approval.
  8. Collect care instructions, reopening guidance and warranty terms at handover.

Frequently Asked Questions

Does a concrete contractor need a New Mexico license?

New Mexico's Construction Industries Division states that construction-related contractors must hold a license. Ask for the business name and license number, then confirm current status and the classification appropriate to your work. The department identifies PSI as its licensing service provider. [4]

Does my driveway or patio need a permit?

Check the exact scope with the city. Construction Services handles right-of-way excavation and barricade activities. Hydrology reviews drainage matters associated with building, paving and grading permits. Describe the footprint, elevation changes and any sidewalk, curb or street-side work when you ask. [1] [2]

How far ahead should I arrange sidewalk work?

For a right-of-way application, Albuquerque requires submission at least 14 calendar days before the anticipated start date. Treat that requirement as a submission deadline. Ask the contractor to confirm approval, supporting documentation and traffic-control arrangements before scheduling demolition. [1]

How much will the concrete installation cost?

Request a site-specific written bid. The city fee schedule lists municipal permit and closure charges rather than driveway or patio construction prices. Ask bidders to separate demolition, disposal, base preparation, concrete specifications, drainage work and traffic control so you can compare the same scope. [3]

Sources and scope

This guide combines the sources below with practical planning guidance. Figures apply to the stated geography and period; request a written quote for your property.

  1. Right-of-Way Activities & Permit ApplicationsCity of Albuquerque · City of Albuquerque, New Mexico · Checked 2026-10-12
  2. Hydrology SectionCity of Albuquerque · City of Albuquerque, New Mexico · Checked 2026-10-12
  3. Barricade FeesCity of Albuquerque · City of Albuquerque, New Mexico · Checked 2026-10-12
  4. Construction Industries BureausNew Mexico Regulation and Licensing Department · New Mexico · Checked 2026-10-12
Scroll to Top